Long-lead equipment tracker

A free spreadsheet for electrical contractors to plan and track switchgear, transformers, generators and other long-lead equipment — working backwards from the date each item is needed on site, and recording every ship date change along the way.

What's inside

  • A backwards planner: enter the need-on-site date, transit time, current lead time and review time, and the tracker calculates the latest dates to submit, get approval and release each order
  • An order tracker for every long-lead item: submittal status, order date, acknowledgment, promised ship date and delivery
  • A ship date history, so every change is recorded with the date you were told and who told you
  • Automatic warnings when a promised ship date falls after the date the job needs the equipment
  • A delivery checklist for offloading, rigging, storage and inspection on arrival

Works in Microsoft Excel and Google Sheets.

Get the template

Free. We'll email it to you.

    Preview

    ItemNeed on siteLatest submittal dateSubmittal statusPromised ship dateAt risk?
    Main switchboard[DATE][DATE]Approved[DATE]No
    500 kVA transformer[DATE][DATE]Under review—Check
    250 kW generator[DATE][DATE]Sent—Yes

    How to use it

    How do you manage long-lead electrical equipment on a project?

    Read the guide →

    Want this done for you?

    Project Tracker follows every long-lead item from submittal to delivery, compares promised ship dates with the date each job needs them and flags slips early.